The project is located in the governorate of (Al-Kharj) and work began on (6/24/1432 AH) and the project was completed on (5/25/1443 AH) and its total cost was (23,000,000) million riyals and consists of (a building consisting of a five-a-side multi-purpose playground used as a football, volleyball, basketball and handball field, as well as a swimming pool with an area of 600 m 2 and a concrete building with an area of 750 m 2 consisting of two floors containing (3) halls for various games, changing rooms and bathrooms)