The project is located in the governorate of Al-Kharj and was launched on 1438/10/9H and was completed on 1439/5/12 H and its total cost (15.894.944 million riyals) consists of (furnishing the college building with a flat 105000 M2 with a total cost of 2500 students for a three-role building)