The project is located in the governorate of Al-Falaj and was launched on 1429/11/18 H and was completed on 1434/11/5 H and its total cost (224.390.948 million riyals) consists of (three floors flat (36000 m2) and consists of study rooms and factories in addition to the general site and pavements around the college)