The project is located in the governorate of Al-Falaj and was launched on 1431/5/3H and was completed on 1436/4/28H and its total cost (145.243.331 million riyals) consists of (number (4) model buildings and number (8) model buildings in addition to the work of water tanks and the work of the general site of the project)