The project is located in the governorate of Al-Falaj and was launched on 1438/10/11 H and was completed on 11440/2/19H and its total cost (2.378.000) million riyals and consists of (four pumps, a built-in power plant with a capacity (500kva) and an average voltage generator of 1 mw)