The project is located in Wadi Al-Duwaser governorate and was launched on 1438/10/29 Ah and was completed on 1440/1/2H and its total cost (4,647.465.79) million riyals and consists of a pre-casting wall surrounding the college and works of filling and settling next to the fence from the inside and outside of the college)